The Cabildo have awarded €28,000 for path and road improvements in Caleta. I am unable to get a great online traslation but someone else may be able to give the details.... http://www.masfuerteventura.com/index.php/canarias/el-cabildo-inicia-la-obra-de-mejora-de-imagen-y-transito-peatonal-entre-el-castillo-y-caleta-de-fuste.html

tarkacreek

Here's a translation Fifi.

The council started the work of image enhancement and pedestrian traffic between the castle and Caleta de Fuste

The project belongs to the Infrastructure Plan and Quality Tourism and is complemented by the rehabilitation of the plot of the old court.

The overall plan for the improvement and beautification of the north entrance of the Castle, belonging to the Infrastructure Plan and Quality Tourism, has begun his second work. In this case it is recovered for pedestrian and cycling the side of the FV-2 between the castle and Caleta de Fuste. The demolition of the old stadium and rehabilitation of their plot ended a few weeks ago.

The Minister of Tourism, Blas Acosta, stresses the importance of "running a constant level in investment dedicated to the maintenance of the tourist areas."

"The work on these public spaces should be constant because they are largely a showcase for the destination Fuerteventura. Addition, as a transit area for visitors must meet income criteria and connect places of interest to tourists," he adds.

The work 'road corridor Conditioning the side of the Fv-1-Castillo Caleta de Fuste' has a budget of EUR 28,788.57 and two months of implementation.

The project is located on a plot of municipal ownership qualified by the General Plan as a green area of ​​Antigua, which is located on the west side of the FV-2 at the level of urbanization Caleta de Fuste.

With the execution of this work is finished the west side of the FV-2, which currently poses no treatment, giving the area a vial conditioning on both sides.

The works to be performed are those for the conditioning by coarse aggregate performance area, planting season flower within a flower and implementation of appropriate irrigation system.

While be excavated about 25 centimeters deep in the entire actuating surface for placing an anti-felt and herbs
coarse aggregate, thus avoiding the occurrence of weeds and subsequent maintenance considerably reducing the conditioned area.

Brightspark

I'll believe this when I see it, a bit like the bus station

Ola

What a pity there wont be any tourists to see the new work due to  the Holiday rental law - at least all the AI tourists will get to appreciate it travelling to and from the airport in their coaches. :)

fifi

Thanks Tarkacreek. Its a bit difficult to understand still isnt it?

The works to be performed are those for the conditioning by coarse aggregate performance area,.

While be excavated about 25 centimeters deep in the entire actuating surface for placing an anti-felt and herbs


I wonder what that means?

woe10

Quote from: brightspark on August 16, 2012, 16:48:50 PM
I'll believe this when I see it, a bit like the bus station

It´s like a lot of things BS. The post office is a prime example. it´s a joke. With all the empty locals in the centre of Caleta, one would think it could be located in a better place than at the back of Hotel San Jorge, with one girl working, with a queue out of the door.
The empty Banca Marche opposite Caleta Gardens would be in the right location and a good size. 

Paddster

Quote
Ola
Newbie

Thank You
-Given: 0
-Receive: 0
Posts: 18

With us since
20/11/2008


Re: Road and path improvements in Caleta
« Reply #3 on: August 16, 2012, 22:31:40 pm »QuoteThank YouWhat a pity there wont be any tourists to see the new work due to  the Holiday rental law - at least all the AI tourists will get to appreciate it travelling to and from the airport in their coaches.



LOL....................Brilliant !!  :P :P